The to do list around here is long and growing.
We've had to assess importance and priority to each item on the list.
Some items fall under Big Major jobs that need Patrick and need to be done soon.
Other items, (the ones I really want completed the most) fall under dreams, and can wait until most other items are completed. Apparently trees and gazebos and charming foot bridges over the stream fall under this category.
Then there are the boring mundane but better get on it quick tasks that eat up all available time. Such things as clean out the chimney, chop firewood, winterize the water pump, winterize the windows, ... I sense a strong winter theme! Don't be fooled by the short sleeved shirt... The high all day was only 40*.
All this, amongst the cooking, laundry, dishes, school and driving to town every day (which alone is a 3 hour endeavor) And there is still some unpacking, settling in to do.. the fine tune stuff like where to hang laundry to dry inside and how to make room in the utility room for the freezer so I won't have to trek to the garage in sub-zero temps for a pound of hamburger. Oh and the newest headache. The constant clean up by the front door from people daring to enter and exit the house.. I've never swept and/or vacuumed so much. There's dirt off of shoes. There's endless mittens, hats and coats and no where to put them. There's wood chips and sawdust from carrying in wood for the fireplace. And it's not even winter yet!
BUT...
The garage roof leaking jumped to the top of the Big Major jobs that needs to be done soon list when we discovered;
a. it leaks.
b. the weather was forecasting rain... lots of rain (which was great news for the local inferno 3 miles to the west of us but not so great news for all our belongings stored in the garage)
The garage is a solidly built structure. It is a great size. However when the roof was put on they didn't use any of that roofing paper that creates a barrier between the metal roof and the contents below. So the metal roofing was removed. The barrier paper was installed over the wood and then the metal roofing was reapplied.
As you can see... the garage door was prepped for painting in my overzealous paint scraping phase. Now I just need a day of good temperatures.
As you can see the barn roof still has a gaping hole that is partly repaired and will be tackled ... soon. (whenever that is)
All that happens when it rains in the barn is ... mud.
As you can see, Miles is laying down on the job. Apparently they ran out of screws or nails or something minorly important. He was waiting for the supplies to be replenished.
It was a very successful day. The garage was re-roofed. The barn roof also was completed. AND...
the cellar roof was given an upgrade.
The garage door is still waiting.
Patrick says painting is my department.
I said I'd like to paint a mural or an optical illusion.
The weather says, maybe next week will have a 2-3 hour opening above 50*.
That's not much time for anything more than a quick coat of paint.
I'm struggling to decide on a colour....
I'm still wishing for a mural, but perhaps a base coat would be a good idea for now.